RulePortals
Projecting portal: gable wall and terrace
portal.gable-wall
Stated in a 19th-century treatise, above all the Lehrbuch of 1890.
Statement
Where the portal arches project beyond the upper wall, the projection needs a covering, on older works a gable roof. With a large projection walling up the whole block would waste mass: a gable wall stands only on the foremost arch, its thickness set by its own stability, and behind it lies a terrace at the level of the inner triforium floor, reached by passages through the buttresses from the gallery at the foot of the aisle roofs. Surplus terrace width can be covered by a lean-to roof against the gable wall (Reims, with a free pier tied to the gable by a binder). Simpler works omit the gables and end with the gallery. Water leaves through the buttresses to a gargoyle (Reims) or by gargoyles on both sides of the buttresses at the gable feet (Amiens).
Parameters
- terraceLevel
- innerTriforiumFloor
- drainage
- throughButtress, gargoylesBothSides, walkwayRoundButtress
Sources
„Bei bedeutendem Vorsprung des Portals würde es indes eine Massenverschwendung sein, das Viereck abcd voll zu mauern.“
“With a large projection of the portal, however, it would be a waste of mass to wall up the rectangle abcd solid.”
Ungewitter 1892, p. 554 (scan), Fig. 1316
Ungewitter 1892, p. 555 (scan), Fig. 1317
Where implemented
Not implemented yet.