RuleMouldings
Buttress offsets
moulding.buttress-offset
Stated in a 19th-century treatise, above all the Lehrbuch of 1890.
Statement
Buttresses reduce in steps rather than by a continuous batter; offsets must not cut beyond the stability line nor change the section abruptly, since an abrupt step concentrates pressure at its edge and opens a shear crack beside it. Better is a gradual change by steep slopes, gables or pinnacle loads. A single offset belongs at the height of the inner capital, where the vault thrust acts; two lie above and below it, and the lower may merge with the sill course. Lacher sets the lower edge of the offset cornice by the inner capital and keeps the area above square if a pinnacle stands on it.
Modern note
The 3D model steps every wall buttress twice with sloped weatherings (at about 0.38 and 0.7 of its height, depth reduced to 0.72 and 0.48 of its free projection). Those fractions are ours; the offsets are not yet tied to the inner capital height.
Sources
Ungewitter 1892, p. 446 (scan), Fig. 1030
Ungewitter 1892, p. 447 (scan), Fig. 1031, 1032, 1033, 1034
Where implemented
@ungewitter/mesh#buildChurch