Skip to content
Ungewitter

RuleMouldings

Base course (Sockel)

moulding.base-course

treatiseimplementedUngewitter 1890 (Mohrmann)

Stated in a 19th-century treatise, above all the Lehrbuch of 1890.

Statement

The plinth only leads the wall load onto a wider base and covers the projection; a plain slope of 45° or steeper, or a weathering, suits both and is used even on rich buildings. A flat curved slope expresses the spread of load, its lower edge chamfered; a remnant of the weathering may separate the hollow from the wall to mark the stone. Romanesque and early Gothic plinths often have a hollow over a roll. Profiles that hold water in a raised rim are better avoided. Important works use two stones with two mouldings separated by a vertical plate whose height sets the character.

Sources

Where implemented

@ungewitter/gothic#courseProfile

Tools in this area

Lessons on the same pages

Terms